Projects

US Gulf Coast

ReGen III’s USGC facility is currently sourcing project financing. ReGen III will be locating to a brownfield site to make use of infrastructure already in place. The site will process 5,600 bpd of UMO into Group III and Group II+ base oils and other products.

ReGen III is moving forward with the engineering phase and is projecting the USGC Facility will be operational and running at full capacity 18 months after the requisite financing is obtained.